Can suppliers of gravity-based gold recovery equipment provide a complete production line?
30-Second Overview
- A turnkey gravity gold recovery line can be fully supplied by one vendor, with process design and equipment manufacturing done by the same team.
- The line unfolds across five stages — crushing, grinding, early gravity recovery, downstream catch-all, and dewatering — with interfaces aligned throughout.
- Gravity recovery is embedded in the grinding circuit, "recovering early what can be recovered," trapping coarse free gold ahead of time to prevent over-grinding and save reagents.
- Fine gold is caught by flotation or cyanidation as a safety net, lifting overall recovery 5–8 percentage points above gravity-only circuits.
- Whether the solution fits you depends on your ore's liberation size and clay content — best to send a sample for a beneficiation test first.
Imagine a plant processing several hundred tons of gold ore a day, with gold of mixed coarse and fine grain sizes. You worry about over-grinding turning coarse gold into unrecoverable slime, and about fine gold slipping straight into the tailings. Can such a line carry the ore all the way from run-of-mine to gold concentrate? — Yes, provided the equipment supplier can take hold of the entire circuit's process as one.
What This Solution Is
The core of gravity gold recovery is to use the gravity separation process (which stratifies particles by density) to pull out coarse free gold first, then handle the remaining fines with flotation or cyanidation. What turnkey supply must do is lock those two core links, plus the upstream crushing/grinding and downstream dewatering, into one aligned line.

What Problem It Solves
When you assemble a line yourself, the most agonizing thing isn't the price of the equipment — it's the stages not connecting. Crushing capacity doesn't match the mill, grinding size doesn't match the shaking table feed, and gravity tailings concentration doesn't match the cyanidation feed. Each stage looks fine on its own, but together they just won't run smoothly.
This solution draws the responsibility into one place: from fine free-gold recovery units like the centrifugal concentrator through the downstream leaching stages, all designed by the same team as one process. New plants that want a one-shot complete setup, and older plants that want to add an early gravity-recovery stage into the grinding circuit, both fit this route. Many old mines dominated by coarse free gold — in the Zhaoyuan gold district of Shandong and around Johannesburg, South Africa — were converted exactly this way.
Core Structure & Principle
① Crushing
Run-of-mine ore enters a jaw crusher for primary crushing, breaking large conglomerate blocks down to a size the mill can handle.
② Grinding
A ball mill with a spiral classifier forms a closed circuit, with gravity equipment embedded directly into the grinding loop.
③ Gravity
Classifier sands go to a sawtooth jig for roughing (stratified by pulsating water), then a 6-S shaking table for cleaning, directly producing gold concentrate.
④ Catch-all
Gravity tailings still carry fine gold; flotation or cyanide leaching brings it back.
⑤ Dewatering
A thickener with a filter press produces a dry, transportable concentrate and dry-stacked tailings.
As long as the gravity stage locks in the coarse gold early and the downstream stage catches the fine gold, the line leaks on neither end — coarse recovered early, fines caught at the back.
Think of the line as a conveyor: someone up front picks out the coarse gold first, someone downstream sweeps up the fine gold again, and one team handles the connections in between.

Why Choose It
Aligned capacity, matched interfaces
Equipment is designed to one process flowsheet, so machine builders know upstream feed rates and downstream separation requirements — no "drawings that don't match the machine" disconnects.
Prevents over-grinding, saves reagents
Coarse free gold is intercepted inside the grinding circuit, "recovered early while it can be," cutting slime from over-grinding and the reagent dollars that would otherwise be spent.
Higher overall recovery
Adding a flotation or cyanidation stage also captures the fine gold, lifting overall recovery 5–8 percentage points over gravity-only — in high-tonnage plants that gap is real, tangible gold.
One point of responsibility, no finger-pointing
Process designed by one team, equipment built at one base — if something goes wrong there's a single party to answer to, instead of shuffling blame between several vendors.
Applicable Scenarios & Limitations
✓ Where it works best
Ores dominated by coarse free gold with good liberation, where early gravity recovery pays off clearly; ores with limited clay, keeping the washing burden under control. If the fine stage needs reinforcement, a unit like the vibrating sluice (for fine gold recovery) can serve as a scavenging supplement.
✕ Where it's not recommended
Ores dominated by fine locked gold with very little free gold, where the gravity stage yields limited benefit and the process focus should shift to leaching; or feed with strongly fluctuating clay content, which calls for reinforced washing first. To be frank, this solution is no silver bullet — it solves the specific class of ore that is "mixed coarse-fine, coarse first."
So before placing an order, it's best to send a sample for a beneficiation test and set the flowsheet from comparative gravity-vs-leaching data, rather than jumping in on experience alone.
How to Implement
-
Step 1 — Provide ore information
Tell us the ore type, head grade, target throughput (t/day or t/h), feed size, site water & power conditions, and budget. This step is free of charge.
-
Step 2 — Selection proposal and quote
Based on sample analysis or test results, we finalize the flowsheet and issue an equipment selection list with a transparent quote — one file showing "what process, what equipment, how much it costs."
-
Step 3 — Drawing design
Process flowsheet design, equipment layout, general plant plan, civil-engineering condition drawings, and technical briefing — all delivered at once.
-
Step 4 — Manufacturing and shipping
In-house production scheduling, factory inspection, and logistics coordination, so equipment arrives safely at the destination port.
-
Step 5 — Installation, commissioning & training
Engineers oversee installation on site, run joint loaded test commissioning, and train operators. You can organize civil works and general installation labor locally while the supplier sends engineers for technical oversight — saving on labor costs. For dewatering, we recommend a high-efficiency thickener with a plate-and-frame filter press, so dry-stacked tailings and concentrate transport are both taken care of.

Consulting & Cooperation
Send us your ore data
If you have this kind of ore, or an existing line you want to fit with a gravity stage, send us your grade, particle size, gold occurrence state, and processing scale. If it fits, we go straight to selection and quotation; if verification is needed, send a sample for testing. We do both process design and equipment manufacturing — there is no gap in the responsibility chain.