Xenotime (rare earth) processing plant solution: Xenotime is an important rare earth phosphate mineral, occurring mainly in beach placer sands and weathered crust deposits and commonly associated with heavy minerals such as monazite, zircon and ilmenite. It has a relatively high density and is weakly magnetic, and is an important feedstock for heavy rare earth elements.
GravityMineral's xenotime processing plant uses a combined "wet gravity roughing + dry magnetic cleaning" circuit. Gravity upgrading is carried out in spiral concentrators and shaking tables, then the concentrate is dried and passed through a three-roll gradient magnetic separator. Using low, medium and high field intensity settings, xenotime is progressively separated from monazite, magnetic iron minerals and non-magnetic zircon, producing a high-grade xenotime concentrate (REO ≥ 45%).
What Is Xenotime?
Xenotime (YPO₄) is a phosphate mineral rich in heavy rare earth elements (HREE) — yttrium, ytterbium, erbium and others — and is the main feedstock for a yttrium concentrate. It has a density of about 4.4–5.1 g/cm³ and a hardness of 4–5, commonly forming tetragonal prismatic crystals, and occurs in granite pegmatites and beach placer sands. Because HREE demand is concentrated in magnets and phosphors, xenotime concentrate is one of the highest-value rare earth products recoverable from heavy mineral sands.
The core of xenotime processing is that its density is close to monazite and zircon, but its magnetic response differs distinctly. GravityMineral's standard xenotime beneficiation process therefore uses a combined "gravity roughing and upgrading + gradient magnetic separation" circuit: gravity is used first to reject light silica sand, then a three-roll magnetic separator separates strongly magnetic minerals, xenotime and monazite in sequence according to their magnetic differences — achieving multi-product recovery.
20 yearsFocused on mineral processing equipment manufacturing
50+ countriesXenotime processing lines exported and commissioned
500+ projectsGlobal mineral processing project experience base
35%China market share in gravity separation equipment
Three-Stage Xenotime Extraction Flowsheet
GravityMineral's flowsheet is purpose-designed for xenotime in beach placer sands and weathered crust deposits, exploiting the density and magnetic susceptibility contrasts for efficient separation.
Stage 1: Wet Gravity Roughing
This stage rejects barren silica sand and produces a mixed heavy mineral concentrate.
- Washing and screening: raw sand is fed to a trommel screen or rotary scrubber to remove shell, coarse sand and other impurities; capacity 30–500 t/h.
- Gravity upgrading: the undersize pulp (30–35% solids) is fed to FRP spiral concentrators for initial upgrading, then to 6-S shaking tables for fine separation (adjustable stroke 8–22 mm) to raise the rougher concentrate grade.
Stage 2: Dry Magnetic Cleaning
The gravity rougher concentrate must be thoroughly dried before precise xenotime monazite separation by gradient magnetic separation. Moisture is the single most common cause of poor separation in this stage: wet feed blinds the roll gaps and sticks to the poles.
- Drying system: the gravity concentrate passes through a dryer (evaporation intensity 40 kg/m³·h) to reduce moisture below 0.5%, preparing it for dry magnetic separation.
- Gradient magnetic purification: the dried material is fed to a three-roll magnetic separator, where the combination of low, medium and high field intensities achieves staged separation:
- Roll 1 (low-intensity field): removes strongly magnetic minerals such as magnetite;
- Roll 2 (medium-intensity field): separates and upgrades xenotime;
- Roll 3 (high-intensity field): upgrades monazite.
Stage 3: Tailings Handling and Integrated Resource Recovery
Depending on composition, magnetic tailings can be returned to the monazite recovery circuit, while the non-magnetic product can be further treated to recover zircon and rutile — multi-mineral recovery that maximises the value of the resource.

Core Equipment Configuration and Selection for a Xenotime Processing Plant
The challenge in xenotime processing lies in efficient upgrading in the gravity stage and precise separation in the gradient magnetic stage. The table below lists the core equipment and duty stations used in a xenotime processing plant.
| Process stage |
Main equipment |
Technical features |
| Pre-treatment |
Rotary scrubber |
Wear-resistant design, suited to gravel-bearing placer sands. |
| Wet gravity separation |
FRP spiral concentrator |
FRP construction, corrosion-resistant — suited to humid beach environments. |
| Wet gravity cleaning |
6-S shaking table |
Adjustable stroke 8–22 mm for high-precision gravity separation. |
| Drying system |
Placer-sand dryer |
Evaporation intensity 40 kg/m³·h; provides specification dry feed for magnetic separation. |
| Dry magnetic separation |
Three-roll magnetic separator |
Adjustable low, medium and high fields for staged separation of xenotime and monazite. |
Target Technical Indicators and System Advantages
Technical targets
- Capacity: 30–500 t/d (expandable on request).
- Xenotime concentrate grade: REO ≥ 45%.
- Monazite concentrate grade: REO ≥ 55%.
- Water consumption: 0.5–2 t per tonne of ore (recirculated in the gravity stage).
System advantages
- Efficient separation: gravity and magnetic separation work together for high recovery and excellent concentrate grade.
- Economical investment: a streamlined flowsheet with reasonable equipment cost and low operating cost.
- Highly adaptable: particularly suited to beach placer sands, with a wide feed size range.
- Integrated recovery: xenotime, monazite, zircon and other valuable minerals can be recovered together.

Why Build Your Xenotime Plant with GravityMineral
Xenotime projects typically face shifting mineral composition, difficulty separating xenotime from monazite, and strict impurity limits. The mineral processing industry does not lack equipment — what it lacks is a partner that understands both gravity upgrading and gradient magnetic separation, and can make the flowsheet work as one system.
| Common problem |
GravityMineral's solution |
| Xenotime and monazite have very similar magnetic response, making separation difficult |
Three-roll gradient magnetic separation uses the difference between medium and high field intensity to achieve staged separation. |
| High salinity and humidity on beach sites cause rapid equipment corrosion |
Spiral concentrators use FRP with a corundum lining — wear-resistant and corrosion-resistant for harsh conditions. |
| Design institute drawings and equipment supply are disconnected, so interfaces mismatch |
Equipment manufacturing, flowsheet design and on-site commissioning sit within one closed-loop team — the interfaces never clash. |
- 20 years focused on gravity separation: two decades of building spiral concentrators and shaking tables — which equipment suits which ore condition, which flowsheet suits which size fraction, all backed by retrievable historical experience.
- Full gravity / magnetic coverage: GravityMineral supplies not only gravity roughing and upgrading, but also deep-cleaning equipment such as three-roll magnetic separators.
- 50+ countries, 500+ global projects: Southeast Asian beach placer operations and other real sites are the best test of equipment reliability and adaptability.
- Six official credentials: ISO9001, S-certified supplier, National High-Tech Enterprise, Jiangxi Provincial SRDI (specialised, refined, distinctive and innovative) SME, "Contract-Honoring and Credit-Worthy AA Enterprise", and "Major Taxpayer".
Xenotime Processing Plant Price and Investment Reference
There is no standard price for a xenotime processing plant — for the same throughput, differences in feed grade, mineral assemblage and site conditions can change the equipment configuration and capital cost considerably. GravityMineral does not quote "paper prices" detached from the ore; instead we cost the full picture against the following cost structure:
- Equipment investment: washing and screening stage, gravity stage (spiral concentrators / shaking tables), magnetic stage (three-roll magnetic separator) and drying stage. Modular design allows staged investment to suit your budget.
- Free process design: flowsheet design, equipment selection and plant layout drawings are completed by GravityMineral's in-house design team — no external design institute required.
- Civil works and installation labour: civil construction and general installation labour are organised locally by the client; GravityMineral engineers provide on-site technical supervision.
- Operating cost (OPEX): no reagents and no chemicals in the gravity stage, high water recirculation — overall operating cost is low.
- Lead time and funding rhythm: manufacture of core standard equipment takes about 40–60 days; a full EPC turnkey project typically takes 7–12 months from contract effective date to reaching production targets.
Tell GravityMineral your ore type, feed grade, target throughput (tonnes per hour), feed size and site conditions, and our engineers will draw on a 500+ global project database to issue a transparent equipment selection list and quotation.

From Process Design to Production Targets: GravityMineral's Service Workflow
GravityMineral does more than sell equipment: we provide a full-cycle service covering mineral analysis, flowsheet design, equipment manufacturing and on-site installation and commissioning. A xenotime project typically advances through the following milestones:
- Requirement review (3–7 days): provide ore type, feed grade, target throughput, feed size and site conditions; GravityMineral proposes a preliminary direction at no charge.
- Process design and selection quotation (7–15 days): engineers combine orebody conditions with the 500+ global project database to fix the gravity–magnetic route and issue the equipment selection scheme, with selection and quotation delivered together.
- Drawing design (7–15 days): flowsheet diagram, equipment list, plant layout drawing and civil works condition drawings, completed by the in-house design team — design is never outsourced.
- Equipment manufacturing (40–60 days): scheduled across two in-house manufacturing bases, with quality control from raw material to factory test run.
- Shipping and logistics (30–60 days) + on-site installation and commissioning (60–150 days): engineers supervise installation on site, carry out single-machine and linked-circuit test runs and operator training — delivery is complete only when commissioning meets the targets.
A conventional mineral processing EPC turnkey project typically takes 7–12 months from contract effective date to reaching production targets.
Other Gravity–Magnetic Combined Process Solutions
The core of xenotime separation is "gravity upgrading + gradient magnetic separation". If the ore you process also involves a complex heavy mineral assemblage, the following solutions may offer useful reference:
Xenotime Processing: Frequently Asked Questions (FAQ)
Q1: How are xenotime and monazite distinguished and separated?
A: Xenotime and monazite are both rare earth phosphate minerals with similar densities, but their magnetic responses differ slightly. Xenotime's weak magnetism is slightly stronger than monazite's, so a three-roll magnetic separator can separate them in stages: the medium-intensity field attracts xenotime first, and the high-intensity field then attracts monazite.
Q2: Why must the material be dried before magnetic separation?
A: Dry magnetic separation requires dry, free-flowing feed. Wet material entering the separator not only blinds the gaps between the magnetic rolls but also sticks to the poles, seriously impairing separation efficiency. The gravity concentrate must therefore be dewatered in a dryer to below 0.5% moisture.
Q3: Roughly how much does a complete xenotime processing plant cost?
A: The actual cost depends on your throughput (tonnes per hour), feed grade and target concentrate specification. Once GravityMineral understands the ore conditions, we issue a transparent equipment list and quotation covering the scrubber, spiral concentrators, shaking tables, dryer and three-roll magnetic separators.
Q4: If the feed has a high clay content, will that affect gravity separation?
A: Yes. High clay content seriously interferes with gravity separation. GravityMineral installs a trommel scrubber or trommel screen at the front of the circuit to wash and deslime first. Only washed pulp enters the spiral concentrators and shaking tables, preventing fine slimes from coating the xenotime and causing losses.
Q5: How are the fine slimes in the tailings handled? Will they pollute the environment?
A: No. GravityMineral installs a thickener and filter press at the end of the circuit. After thickening and settling, the slurry is filter-pressed into dry cake for stacking, while the clear water is returned for reuse. This achieves zero discharge and saves a significant amount of water.
Q6: Can you supply a single shaking table? What if we want to expand later?
A: Yes, single units can be supplied. GravityMineral supports modular purchasing: you can start with a washing + spiral concentrator set and add the magnetic and drying stages later when budget allows. Because the interfaces are reserved in the original design, expansion does not require rebuilding — you simply add equipment in proportion.
Q7: Our feed grade fluctuates a lot — can your flowsheet cope?
A: Yes. Process design accounts for the ore's variation range and operating tolerance. Throughput, stroke and slope of the gravity stage (spiral concentrators and shaking tables) can all be adjusted to the feed grade. If variation exceeds the normal range, engineers set the operating parameters for each condition during on-site commissioning.
Q8: For projects in Africa or Southeast Asia, can you send engineers for on-site installation?
A: Yes. GravityMineral's products and services have been exported to more than 50 countries. We dispatch on-site engineers to supervise equipment positioning, single-machine and linked-circuit test runs, recovery adjustment, and to train your local operating team until the line runs stably and meets the targets.

EPC Turnkey: End-to-End Xenotime Gravity Engineering
GravityMineral provides professional, economical and highly reliable turnkey solutions for xenotime projects worldwide, covering the full cycle of technical support:
- Solution design: a gravity–magnetic flowsheet and equipment configuration tailored to the specific characteristics of your ore sample.
- Engineering services: production line planning and 3D drawing design completed in-house — medium and large projects can save hundreds of thousands of dollars in design fees.
- Equipment manufacturing and supply: core gravity and magnetic equipment is produced at GravityMineral's two in-house manufacturing bases, with quality control from raw material procurement to factory test run.
- Installation and commissioning: engineers dispatched worldwide to supervise installation, single-machine and linked-circuit test runs, recovery adjustment and operator training — delivery is complete only when commissioning meets the targets.
- After-sales and optimisation: quality responsibility during the warranty period; after warranty, spare parts supply, technical consultation and process optimisation, with response within 24 hours.
Talk to the GravityMineral engineering team for a customised xenotime plant layout proposal and equipment quotation.